Bond 1995 Projects Status Report

Main Campus Projects

  • The Welding Technology Building, Addition to Campus Services Building, Parking Lot Improvements, Child Care Center, Math-Science Addition, Bus Station, Student Services Building, Central Plant Upgrade, Health Tech., P.A.-P.E. ramp, Addition to Performing Arts, Center Building, 2nd floor N. remodel, Library remodel, and temporary space for Archives have all been completed.

  • Workforce Training Center: The mediation process discussed at the last Board meeting is continuing.

  • Center Building, 4th floor remodel: Demolition is complete. Light metal framing is about 99% complete. LCC electricians are about 70% complete with their rough-in work. Plumbing rough-in is complete. The HVAC subcontractor is about 95% complete with their rough-in work. Drywall is about 85% complete. Painters are about 60% complete. About 85% of the casework has been fabricated. Suspended ceiling grid is about 50% complete. Placement of ceiling tile is about 25% complete. Carpet installation has started as has the hanging of doors and installation of hardware. The project is still within its original time schedule and budget.

  • Sewer Lagoon Upgrade: The engineers hired by the college to design the Upgrade to the existing water treatment plant are continuing to prepare the Preliminary Engineering Report to be submitted to DEQ. Specific information about the size of plant and an updated cost estimate is scheduled to be presented to you at your June meeting.

For more information, contact Bob Mention, Bond 1995 Projects Manager, 463-5747.