WINTER MONTHS WON'T CAST SHADOWS ON STUDENT SERVICES LOBBY.
During a tour of the Student Services building, someone, who most surely has lived in Oregon during our infamous winter months, asked the following questions: What type of lights will be in the lobby? Will the lights sufficiently illuminate the area, especially when it's dreary outside? These types of questions were normal considering the distance from floor to ceiling is 40" and currently, there are no obvious indications of lighting fixtures. However, luminaries, as they are called in the construction trade, will be in place shedding light on the main lobby. The fourteen luminaries, or lights, will be 8" cylinders suspended 36" down from the ceiling by pendulum lines. In addition to the suspended luminaries, along the north and south sides of the lobby at the second floor level, over thirty wall-mounted lights will also be installed. Let there be light! Turning to current construction activities, elevator installation will commence within the next two weeks. Drywall, texturing, and painting are moving rapidly around the interior perimeter of the building. The last phase of drywall will occur in the lobby area. Ceiling grid should be totally installed on the first floor this week. The ADA entry ramp will also be poured by November 17th .
Questions and comments about any bond construction activity may be directed to 744-4154 or e-mailed to bond@lanecc.edu. All communication received will be regularly reviewed by the Bond Project Management Team (BPMT), the architects, and the Facilities Management Committee.
|  |