September 5, 2000 Update

CEMENT FOR STUDENT SERVICE'S SKY BRIDGE POURED.
As work continues on the sky bridge that will connect the Student Services building with the Workforce Training Center, a cement pour of the foundational wall adds further definition to the structure. You may have noticed that the bottom edge of the bridge seems to be lower on just the northeast side. That is because the Student Services building is actually at a lower elevation than the Apprenticeship building. The sloping bridge allows for compliance with ADA codes and wheelchair accessibility. Adjacent to the ramp at the intersection of the bridge with Students Services will also be a short stairway that leads up to the elevated passageway as well. Before long, Chambers Construction will be making the tie-in to the Apprenticeship building where rooms 217 and 218 are located. LCC trades will then construct a temporary wall at the tie-in that will remain in place until approximately March 2001. Roofing has commenced in all areas. Steel roofing has been installed on the barrel trusses that were recently erected on the west end of the building. Infrastructure work by all trades is proceeding.

Questions and comments about any bond construction activity may be directed to 744-4154 or e-mailed to
bond@lanecc.edu. All communication received will be regularly reviewed by the Bond Project Management Team (BPMT), the architects, and the Facilities Management Committee.
CURRENT PROJECT PICTURES


2011 Site Archive