Bond 1995
Archives |
 |
|
 |
 |

SCIENCE ADDITION
September 12, 2000 Update
SEPTEMBER 13TH POSSIBLE DATE FOR SCIENCE OCCUPANCY PERMITS.
Tomorrow is the scheduled date for the fire alarm test within the Science remodel. If all goes well with the testing, occupancy permits will be issued and staff moved into various locations by the end of the week. Materials continue to be transferred to the facility and installation of audiovisual equipment is taking place. Funds allocated by the FMC are currently allowing LCC Trades to repair gutters on the Science building. Work on the gutters will be finished before fall classes. West Addition: Windows have been installed on the north side and brickwork will be completed by the end of the week. Second floor framing is proceeding very quickly with seventy-five percent of the work already finished. Ductwork is also very near completion. South Addition: Mechanical work should be done by the end of the week. Interior framing is expected to begin in approximately one week. Turning to general work being conducted on the project, the roof of the existing Science building is being joined to the new west addition roof. Parking Lot L, directly south of the project, has been paved and stripped. Multiple ADA parking slots are now designated in Lot L next to the new main entrance of the Science/Math complex. In preparation for the influx of students, sidewalks will be poured this week; all debris will be cleaned up and the lot swept by September 20th.
Questions and comments about any bond construction activity may be directed to 744-4154 or e-mailed to bond@lanecc.edu. All communication received will be regularly reviewed by the Bond Project Management Team (BPMT), the architects, and the Facilities Management Committee.
|  |