January 24, 2000 Update
Science/Math:
The contractor poured concrete on Friday. There are some delays with engineering specifications for the addition to the west, but the project is on schedule for workrooms and labs for the east and south. Some existing concrete beams were X-rayed on MLK day to locate hidden cables so they are not drilled into during future work, and some additional X-ray work may be needed later.