Goto Lane Main   Lane Community College  |   Search Lane    
Bond 1995 Archives 
  Bond 1995 Archives  |  Current Bond Work  |

Bond 1995
 
Archives

CENTER 4th FLOOR REMODEL

May 20, 2002 Update

CENTER 4TH FLOOR PLANS NEAR COMPLETION.
Last week the bond office received the drawings for the Center 4th Floor remodel, which are 95% complete. Bond and FM&P personnel will take approximately one week to review the drawings and then return them to the architects for incorporation of any changes and completion of the final 5% of the plans. The completed drawings and specs should be submitted to the bond office and the building department on or about June 1. At that time, the bond management team will use the completed drawings to set up bid packages for outside contractors. Contracted work can include such things as installation of the HVAC system and sheet metal, and concrete cutting, among others things. It is anticipated that the bids will be opened and the building permit secured sometime the first part of August, approximately two months after receiving the completed drawings. In anticipation of receiving the building permit in August, as well as the significant workload associated with bond and FM&P summer projects, the bond office has hired an additional carpenter and two more electricians. Project managers continue weekly meetings with the trades for organization of multiple aspects of the Center 4th Floor remodel. You can expect to see the staging area for the project located in the grassy area east of Building 20 (Pizza Hut) sometime in August. Personnel from Grounds will level out the area before fabric and gravel is laid down to form an appropriate base for storage of equipment, mechanical items, and recyclable objects. Debris removed from the Center 4th floor will be put in dumpsters located in the old LTD passageway between the Forum and the Center. Jennifer Hayward is working with the project managers to secure outlets for usable materials from the demolition that are not suitable for the remodel.

Questions and comments about any bond construction activity may be directed to 463-5027 or e-mailed to
bond@lanecc.edu. All communication received will be regularly reviewed by the Bond Project Management Team.


2011 Site Archive