CENTER 4th FLOOR REMODEL

March 4, 2002 Update

CENTER 4th FLOOR PUG CLEAR ON PHASING OF REMODEL.
Finalization of the floor plans for the Center 4th Floor Remodel took some time to achieve; agreement about phasing of the project took no time at all. Recently, PUG representatives from the EFL&S and Social Science departments strongly stated their desire to have the remodel take place all at one time rather than being split into phases. The unified desire about a single-phase project is not surprising considering that a multi-phased project would require approximately one year of educational activities to occur side-by-side with construction activities. While a single-phase approach will save significant money and time, it also requires that all personnel and functions on the Center 4th floor be temporarily relocated to other classrooms, computer labs/classrooms, specialized learning areas, and office space--no small task. Nevertheless, after completing a preliminary investigation of possible relocation space, bond staff members are optimistic that a one-phase approach to the construction can take place. Although relocation space is identified within the WTC as well as areas vacated by those departments moving to the WTC this summer, another space evaluation will be conducted towards the end of March before final relocation determinations are presented to the FMT.

Questions and comments about any bond construction activity may be directed to 744-4154 or e-mailed to
bond@lanecc.edu. All communication received will be regularly reviewed by the Bond Project Management Team (BPMT), the architects, and the Facilities Management Committee.


2011 Site Archive