 |

Bond 1995
Archives |
 |
|
 |
 |

CAMPUS SERVICES ADDITION
May 2, 2000 Update
Campus Service Addition:
The upper floor has floor coverings about 75 percent installed. Concrete work is finishing up on the exterior ramps, steps and storage areas. A temporary occupancy permit is hoped for by mid-May to allow Printing/Graphics to begin moving some items.
Downstairs, the building inspector has questioned the fire resistive adequacy of the boiler fire enclosure. This question must be satisfied before the boiler can be started. The Laundry boiler is on schedule to be fired up on May 17.
Ted Smouse of Facilities Management and Planning will move the industrial dryers; he was the one who originally installed them in their present location.
Questions and comments about any bond construction activity may be directed to 744-4154 or e-mailed to bond@lanecc.edu. All communication received will be regularly reviewed by the Bond Project Management Team (BPMT), the architects, and the Facilities Management Committee.
|  |