CHILD CARE FACILITY

March 8, 2000 Update

Child Care Center:
College job manager Todd Smith and electricians Danny Avalos and Ron Case saved the college thousands last week by taking the initiative to locate and borrow a special hydraulic tool called a crimper. The crimper was needed to energize the transformer, which college electricians also installed themselves earlier in the project, and supply power to Building 1. Graybar Electric loaned the tool. Otherwise, the college would have had to buy its own crimper for about $4,000. A suspended ceiling is being installed in Building 1, and interior walls have been painted. Exterior walls will be painted when weather permits. Building 2 is in the drywall phase. Building 4 roof sheeting is being installed. Lane Family Connections is expected to move into Building 3 in early May. General contractor is John Hyland.

Questions and comments about any bond construction activity may be directed to 744-4154 or e-mailed to
bond@lanecc.edu. All communication received will be regularly reviewed by the Bond Project Management Team (BPMT), the architects, and the Facilities Management Committee.
CURRENT PROJECT PICTURES


2011 Site Archive