Goto Lane Main   Lane Community College  |   Search Lane    
Bond 1995 Archives 
  Bond 1995 Archives  |  Current Bond Work

WELDING BUILDING
SCIENCE BUILDING
LTD STOP (temp)
WEST PARKING LOT

Bond Update - August 2, 1999

ACTIVITY ON WELDING FACILITY CONTINUES
Excavation of the foundations for the Welding facility began on July 28th. At the same time, excavation of trenches that will hold drains and water and sewer lines also began. Trench excavation will take place in the flowerbed that is directly adjacent and parallel to LCC's motor pool parking in the northeast parking lot. It is expected that within this week, trench excavation will run the entire length of the flowerbed, beginning at the Welding site and continuing west to the ride shelter in the northeast parking lot. This means that excavation will take place across the main, vendor delivery road at the top of the hill next to the Welding site, run down the hill, across the northern, main, pedestrian entrance, and end at the ride shelter. Already, motor pool parking has been moved straight north, towards 30th Avenue, to adjacent parking slots. Because the pedestrian path into campus from the north parking lot will be disrupted, accommodations will be provided which will continue to allow campus access from the northeast parking area. Alternative delivery routes are being developed as well. It is approximated that trench excavation will be completed the middle of August.

PORTIONS OF ARCHIVES ARRIVING AT TEMPORARY STORAGE
By this printing, Facilities Management will have already begun moving a portion of LCC's archives into temporary, off-campus storage due to main campus construction activities. 1,700 boxes of materials are being moved to a building at 4912 Franklin Boulevard. This location is probably best known as the previous location of the Montgomery Ward Service Center. LCC is leasing 2,625 square feet of space that will accommodate the archives as well as office furniture. Wildish Industrial Development Corporation is the leaseholder.

SUSAN TATAR JOINS BOND PROJECT MANAGEMENT TEAM
Transferring experience gained from 5 years experience in the Facilities Management Department, Susan Tatar joins the Bond Project Management Team as the Administrative Support Specialist. Among other duties, Susan will be responsible for preparing and processing all documents involved with each of the bond contracts. Those individuals interested in setting appointments or contacting Bob Mention should contact Susan Tatar at 744-4154, or extension 2727 if calling from campus.

The Bond Project Management Team(BPMT) will be available during summer hours to provide information and answer any questions that may arise. All communication received by the BPMT during summer months will be reviewed regularly by the team, the architects, and the Facilities Management Committee. The BPMT can be reached at 744-4154, Email to Nancy Nichols, or on the web at http://2011sitearchive.lanecc.edu/campsvcs/main.html


Panorama of the Childcare & new Parking (near west entrance)



Last Updated: August 2, 1999
2011 Site Archive